Notification of Hydrological Information on Lancang River(July 28, 2021)
MWR,China Author: 2021-07-28
The outflow of Jinghong Hydropower Station will be gradually decreased from 900-1300m3/s to about 700m3/s from 31st July to 20th August, 2021 so as to coordinate with the power grid construction.
In case of any other significant variation of the outflow, you will be informed in a timely manner.